Maintenance Aging Report - Oklahoma - OKC
Regional maintenance aging report for Oklahoma - OKC, listing all hotel items at 14+ days with critical maintenance items first.
07/29/2026 | Produced: 7:51 AM
Hotels in Region
3
From the contact workbook
14+ Day Items
9
Current regional aging bucket
Critical Items
3
Water, electric, PTAC, HVAC items first
Oldest Item
51
Days old in this region
Executive Summary
Oklahoma - OKC currently has 9 maintenance item(s) at 14+ days across 3 hotel(s). Critical items are listed first inside each hotel. Leading critical categories in this region are electric (3).
Regional Leadership
- Regional Manager: Terra Smith
- Regional Maintenance: Charles Lengele
What Needs Attention Now
- OKC - Airport has 3 item(s) at 14+ days, oldest at 29 day(s), with 2 critical.
- OKC - Frontier has 3 item(s) at 14+ days, oldest at 51 day(s), with 1 critical.
- OKC - Northwest has 3 item(s) at 14+ days, oldest at 37 day(s), with 0 critical.
14+ Day Items by Hotel
OKC - Frontier
OK - OOF · 3 item(s), oldest 51 day(s), 1 critical
- Critical 21664-1 · 51 day(s) old · created 06/08/2026
room 327 kitchen outlet needs to be replaced
Priority: Normal · Category: electric - Standard 21947-1 · 44 day(s) old · created 06/15/2026
stairwell needs to be fixed
Priority: Normal · Category: general - Standard 22888-1 · 21 day(s) old · created 07/08/2026
rails by room 215 needs to be repaired cause they are loose
Priority: Normal · Category: general
OKC - Airport
OK - OOA · 3 item(s), oldest 29 day(s), 2 critical
- Critical 22578-1 · 29 day(s) old · created 06/30/2026
Power wash 1st floor side walks.
Priority: Normal · Category: electric - Critical 23160-1 · 14 day(s) old · created 07/15/2026
cable box and electrical outlet needs fixed
Priority: Normal · Category: electric - Standard 22579-1 · 29 day(s) old · created 06/30/2026
Light fixture next to room 1001 Broken 07/07/26 need to order base for light
Priority: Normal · Category: general
OKC - Northwest
OK - OON · 3 item(s), oldest 37 day(s), 0 critical
- Standard 22233-1 · 37 day(s) old · created 06/22/2026
tile needs redone in multiple 2nd floor units (outside calls for tile work)
Priority: Normal · Category: general - Standard 22377-1 · 34 day(s) old · created 06/25/2026
sidewalks need sprayed off, slimy from landscapers, slip/fall hazard
Priority: Normal · Category: general - Standard 22986-1 · 19 day(s) old · created 07/10/2026
rm 236 need a new mattress
Priority: Normal · Category: general
Recommended Actions
- Clear critical water, electric, PTAC, and HVAC items first before routine backlog work.
- Force same-day ownership on any hotel carrying multiple critical aged items.
- Use this region-specific view to push daily follow-up by hotel until all 14+ day items are closed.