Eagle Suites logo

Maintenance Aging Report - Oklahoma - OKC

Regional maintenance aging report for Oklahoma - OKC, listing all hotel items at 14+ days with critical maintenance items first.

07/18/2026 | Produced: 7:50 AM

Hotels in Region
3
From the contact workbook
14+ Day Items
9
Current regional aging bucket
Critical Items
3
Water, electric, PTAC, HVAC items first
Oldest Item
40
Days old in this region

Executive Summary

Oklahoma - OKC currently has 9 maintenance item(s) at 14+ days across 3 hotel(s). Critical items are listed first inside each hotel. Leading critical categories in this region are electric (2), water (1), ptac/hvac (1).

Regional Leadership

What Needs Attention Now

14+ Day Items by Hotel

OKC - Frontier

OK - OOF · 3 item(s), oldest 40 day(s), 1 critical

  • Critical 21664-1 · 40 day(s) old · created 06/08/2026
    room 327 kitchen outlet needs to be replaced
    Priority: Normal · Category: electric
  • Standard 21858-1 · 36 day(s) old · created 06/12/2026
    cement by the stairwell and also the stairwell needs to be blocked off by the
    Priority: Normal · Category: general
  • Standard 21947-1 · 33 day(s) old · created 06/15/2026
    stairwell needs to be fixed
    Priority: Normal · Category: general

OKC - Airport

OK - OOA · 4 item(s), oldest 30 day(s), 2 critical

  • Critical 22341-1 · 24 day(s) old · created 06/24/2026
    1028 A/C LEAKING L
    Priority: Normal · Category: water, ptac/hvac
  • Critical 22578-1 · 18 day(s) old · created 06/30/2026
    Power wash 1st floor side walks.
    Priority: Normal · Category: electric
  • Standard 22110-1 · 30 day(s) old · created 06/18/2026
    2032 NEEDS NEW COOKTOP INSTALLED....TS
    Priority: Normal · Category: general
  • Standard 22579-1 · 18 day(s) old · created 06/30/2026
    Light fixture next to room 1001 Broken 07/07/26 need to order base for light
    Priority: Normal · Category: general

OKC - Northwest

OK - OON · 2 item(s), oldest 26 day(s), 0 critical

  • Standard 22233-1 · 26 day(s) old · created 06/22/2026
    tile needs redone in multiple 2nd floor units (outside calls for tile work)
    Priority: Normal · Category: general
  • Standard 22377-1 · 23 day(s) old · created 06/25/2026
    sidewalks need sprayed off, slimy from landscapers, slip/fall hazard
    Priority: Normal · Category: general

Recommended Actions