Maintenance Aging Report - Executive Level
Executive maintenance aging report across all regions, limited to 30+ day items with critical maintenance items first.
05/19/2026 | Produced: 7:53 AM
Regions with 30+ Items
3
Regions carrying executive exceptions
30+ Day Items
5
Executive threshold scope
Critical Items
1
Water, electric, PTAC, HVAC items first
Oldest Item
62
Days old in executive scope
Executive Summary
There are 5 maintenance item(s) at the 30+ day executive threshold across 3 region(s). Critical maintenance items are surfaced first so leadership can isolate the highest operating risk before reviewing routine backlog.
What Needs Attention Now
- Arkansas - South has 1 item(s) at 30+ days, with 0 critical and oldest at 36 day(s).
- Oklahoma - Tulsa has 1 item(s) at 30+ days, with 0 critical and oldest at 62 day(s).
- Lousiana has 3 item(s) at 30+ days, with 1 critical and oldest at 52 day(s).
Executive 30+ Day Items by Region
Arkansas - South
Benton - Thirty
AR - BT · 1 item(s), oldest 36 day(s), 0 critical
- Standard 19794-1 · 36 day(s) old · created 04/13/2026
Carport needs to be pressure washed to get the cob webs and dirty off, might better.
Priority: Normal · Category: general
Oklahoma - Tulsa
Tulsa - Hilti
OK - OTH · 1 item(s), oldest 62 day(s), 0 critical
- Standard 18665-1 · 62 day(s) old · created 03/18/2026
CAMERA'S BY ROOM 145 AND THE FIRST FLOOR END LAUNDRY ROOM
Priority: Normal · Category: general
Lousiana
Baton Rouge - Boardwalk
LA - BRB · 1 item(s), oldest 35 day(s), 1 critical
- Critical 19846-1 · 35 day(s) old · created 04/14/2026
A/C on 3rd floor for electrical room not kicking on and breaker is tripping
Priority: Normal · Category: electric, ptac/hvac
Baton Rouge - Airlane
LA - BRA · 2 item(s), oldest 52 day(s), 0 critical
- Standard 19093-1 · 52 day(s) old · created 03/28/2026
support pole on side of building 3 needs repaired. Airline
Priority: Normal · Category: general - Urgent 19829-1 · 35 day(s) old · created 04/14/2026
FIX FENCE ACROSS FROM BUILDING 4 BY THE APT COMPLEX PLEASE Airline
Priority: Urgent · Category: general
Recommended Actions
- Clear critical maintenance items first, regardless of region, before non-critical aging backlog.
- Escalate every 30+ day critical item into direct leadership review until closed.
- Use the regional packets to force accountability at the hotel level after leadership identifies exceptions.