Maintenance Aging Report - Executive Level
Executive maintenance aging report across all regions, limited to 30+ day items with critical maintenance items first.
05/12/2026 | Produced: 7:53 AM
Regions with 30+ Items
3
Regions carrying executive exceptions
30+ Day Items
7
Executive threshold scope
Critical Items
2
Water, electric, PTAC, HVAC items first
Oldest Item
68
Days old in executive scope
Executive Summary
There are 7 maintenance item(s) at the 30+ day executive threshold across 3 region(s). Critical maintenance items are surfaced first so leadership can isolate the highest operating risk before reviewing routine backlog.
What Needs Attention Now
- Arkansas - North has 2 item(s) at 30+ days, with 1 critical and oldest at 46 day(s).
- Oklahoma - Tulsa has 1 item(s) at 30+ days, with 0 critical and oldest at 55 day(s).
- Lousiana has 4 item(s) at 30+ days, with 1 critical and oldest at 68 day(s).
Executive 30+ Day Items by Region
Arkansas - North
Conway - Skyline
AR - CS · 2 item(s), oldest 46 day(s), 1 critical
- Critical 19709-1 · 33 day(s) old · created 04/09/2026
ROOM 104 INSTALL A SHOWER BAR IN TUB DUE TO NURSES ASKING
Priority: Urgent · Category: water - Urgent 19043-1 · 46 day(s) old · created 03/27/2026
ATTIC FAN IS OUT. MOTOR WENT OUT
Priority: Urgent · Category: general
Oklahoma - Tulsa
Tulsa - Hilti
OK - OTH · 1 item(s), oldest 55 day(s), 0 critical
- Standard 18665-1 · 55 day(s) old · created 03/18/2026
CAMERA'S BY ROOM 145 AND THE FIRST FLOOR END LAUNDRY ROOM
Priority: Normal · Category: general
Lousiana
Baton Rouge - Airlane
LA - BRA · 4 item(s), oldest 68 day(s), 1 critical
- Critical 19653-1 · 34 day(s) old · created 04/08/2026
rm 404 new toilet seat
Priority: Urgent · Category: water - Standard 18195-1 · 68 day(s) old · created 03/05/2026
rm 416 occupied. Cable not working Airline
Priority: Normal · Category: general - Standard 18196-1 · 68 day(s) old · created 03/05/2026
rm 427 occupied cable not working Airline
Priority: Normal · Category: general - Standard 19093-1 · 45 day(s) old · created 03/28/2026
support pole on side of building 3 needs repaired. Airline
Priority: Normal · Category: general
Recommended Actions
- Clear critical maintenance items first, regardless of region, before non-critical aging backlog.
- Escalate every 30+ day critical item into direct leadership review until closed.
- Use the regional packets to force accountability at the hotel level after leadership identifies exceptions.