Eagle Suites Room Handover Checklist

Construction and Operations jointly certify this room is complete and ready to release as rent-ready inventory.
Form Date: 08/17/2026
Property:
Room #:
Room Type:
Inspection Date:
Construction Rep:
Operations Rep:
Scope:
Ready to Rent: Y / N
Mark each item Y or N and add comments if needed
1. Flooring complete and in good order
Y / N
Comment:
2. Paint complete and in good order
Y / N
Comment:
3. PTAC functioning properly
Y / N
Comment:
4. Lights work in room, kitchen, bath
Y / N
Comment:
5. Bath fan functioning and wired to switch
Y / N
Comment:
6. Tub/Shower working, hot/cold, no drips
Y / N
Comment:
7. Toilet works and is not running
Y / N
Comment:
8. Kitchen sink hot & cold faucets work
Y / N
Comment:
9. Cooktop installed and working
Y / N
Comment:
10. Microwave installed and working
Y / N
Comment:
11. Refrigerator/freezer installed, working, clean
Y / N
Comment:
12. TV installed and cable works
Y / N
Comment:
13. Bedframe and bed in room
Y / N
Comment:
14. Dresser in room
Y / N
Comment:
15. Chair in room
Y / N
Comment:
16. Table in room and artwork installed
Y / N
Comment:
17. Mirror installed
Y / N
Comment:
18. All electrical plugs working
Y / N
Comment:
19. Entry door closes, latches, locks; peep hole and QR sign in place
Y / N
Comment:
20. Windows screwed shut
Y / N
Comment:
21. Smoke detector installed and tested
Y / N
Comment:
22. Plumbing Leaks
Y / N
Comment:
23. Room free of debris, dust, trash
Y / N
Comment:
24. Hanging rod installed
Y / N
Comment:
25. Final touch-up complete; no open punch items
Y / N
Comment:
26. Other
Y / N
Comment:
Punch List / Corrections Required
1.
2.
3.
Any item marked N must be corrected before the room is released as ready to rent.